SOLD!!!1.Details Building
Elegant style, colours, exquisite outline, and preciseness
The building has east-west orientation with good view to the mountain. It is placed on a road which is up to 10 min from the center of the city.
Building consists of a basement – with 41 parking places and 16 basement premises , a ground and 1st floor for shops , 1 floor for offices and 3 residential floors.
Construction is solid armoured concrete of floor slabs of 16-22 cm. width depending on the load .
Facades: Water-resistant plaster on top of 6 cm effective isolation.
Windows: Three-chamber / SHUCHO PVC CORONA AS 60 / and for the shops – aluminum.
2. Time frame for construction
Start – June 2006
Completion of rough construction – January 2007
Fully Finishing – December 2007
3. Air conditioning system
3.1. Central air conditioning system
Central heating and ventilation system – providing the air with fan convectors to all premises. Possibility for control of the power.
3.2. The whole building will be gasified.
4. Details of Finishing
- Shops
Floors – granite
Walls and ceilings – latex on top of gypsum plastering
Cabling
- Offices
Floors – granitogress
Walls and ceilings – latex on top of gypsum plastering
Cabling
- Residential floors
Kitchens – kitchen cupboards
Baths – finished
Floor terraces – granitogress
Floor corridors – granitogress
Floor rooms – laminated parquetry
Walls – latex on top of gypsum plastering
Cabling
|